Tanks & Buildings
Site Images
Hyderabad Metropolitan Water Supply & Sewerage Board
Gorle Group of Engineering and Architecture
Ramky Infrastructure Limted
The challenge was to design the clarifloculators for the uplift pressure due to ground water table raise. We also had to to economize the design cost for soil strengthening through engineering fill.