Tanks & Buildings
Site Images
High power committee for implementation of Sabrimala master plan.
Gorle group of engineering and architecture
Ramky Infrastructure Limted
This was the most challenging project among all water treatment plants which we had done so far. Although it is a small capacity plant, the challenges we had in terms of slopes and the soil stability were enormous. We addressed these slopes with great optimization and saved the client huge cost and time.