RCC And Peb Structure
Gorlay Group
3D Views
M/S Ramky Enviro Pvt. Ltd.
The major analysis challenge was to address the moving loads on the loading platform in both axis of the floor plan as the loading vehicles move in any of the direction. We have used grillage analysis to estimate the critical design loadsRcc And Peb Structure