RCC Structure With Pt Slabs
Gorlay Group
3D Views
Gorle Group Constructions
We have addressed the striaght cut slopes with soil nailing and also addressed the water inundation during rains. The site being located in the primary storm water collection zone, the challenge was to address the grade slab in the basement against uplift.