RCC Structure Column-beam Framing System
NA
Site Pics
Alexandria Knowledge Park
Our structural due diligence helped the client save close to 40 lakh rupees. The proposed chiller on the ground level was shifted on to the top of 450 building which not only saved cost but also brought a huge relief to the user in terms of sound and also the efficiency of the chiller too.