RCC Structure Column-Beam Framing System
NA
Site Images
Alexandria Knowledge Park
Description if any our structural due diligence helped the client save close to 40 lakh rupees. The proposed chiller on the ground level was shifted on to the top of 450 building which not only saved cost but also a huge relief to the user interms of sound and also the efficiency of the chiller too.