Tanks & Buildings
Site Completion Pics & 3D Views
Hyderabad Metropolitan Water Supply &Sewwrage Board
The challenge was to design the clarifloculators for the uplift pressure due to ground water table raise. Also to economize the design cost the soil strengthening through engineering fill has been done.