RCC and PEB Structure
Gorle Group
Site Pics & 3D Views
M/s Ramky Enviro Pvt. Ltd.
The major analysis challenge was to address the moving loads on the loading platform in both axes of the floor plan as the loading vehicles could be moving in any direction. We used grillage analysis to estimate the critical design loads.